So I've been trying to set a schedule that I am going to be able to follow for the creation of this film opening to occur. Now this is how I currently see myself with this film:

- Week 1 consisted of introducing the project, talking about format and seeking inspiration.
- It is currently week 2 of the project and I've been able create an outline for the story that is to follow, narrow down my idea to make an actual plot and storyline, and I've been able to create a schedule.
- So week 3-4. This is where the majority of the film opening will be produced. All of the shooting will probably be done during these two weeks along with some of the editing. The reason I will do most of the film's creation in these two weeks is because I'm not exactly sure what I'm going to be doing week 5.
- Week 5. This is the week of spring break. The answer as to whether I will be able to work on my project this week is unclear. I'm not sure if I will be around to be able to shoot anything but some editing might be done this week.
-Week 6 is the week I plan to have any reshoots of scenes that may not have come out well. This week will most likely be dedicated to making the last finishing touches to the film.
- Week 7 is the week where I work on the Creative Critical Reflection. I'm going to finish the CCR and then have the project completed by April 14.